AUC point and interval estimates from a complex survey design logistic regression
Atualizado em:
Calculate the AUC with 95% CI from a complex survey design logistic regression model and port original analysis script from base R to tidyverse framework.
Technical Report for Joe Cormier (US, 2022)
Analyses performed
- Descriptive analysis
- Inferential analysis